The Mill Restoration
Click on any image below to step through the gallery…
- 2004 Before work commenced
- Ground floor on day 1
- 1st floor on day 1
- Existing lean to removed to become the kitchen
- Relevelling of first floor joists
- 2 new windows in 3 feet of wall
- Rebuilding of the gable end
- Relieved the gable end was made stable
- Staircase to second floor installed
- Tanking membrane being installed to the below ground floor walls
- Walls were repaired with haired lime plaster
- Insulation applied to walls and ceilings